Scope of Work
- Civil works inside cavern and shaft including plugging for strategic storage of crude oil project at Visakhapatnam. (Work awarded to Indus Pioneer JV)
- Worked on over 18,072 cum meters of concrete under both above and below ground level.
- Concreting of 2.5 meter to 4.0 meter thick slabs at a height of 60 meters above the pump pit and 40 meters below ground level
- Hot crude pipe encasing works, structural guide frame works are 80 to 100m below ground level.
View all projects